Assignment 3 Greendale Project ReDux
Due Week 8 and worth 90 points
This assignment consists of two (2) parts: a
project schedule, and a written response. You must submit both parts as
separate files for the completion of this assignment. Label each file name
according to the part of the assignment it is written for.
Part A: Project Schedule
(Submit as one [1] Microsoft Project file)
Create a multi-level work breakdown structure
(WBS) and detailed project schedule, using the information from the “Greendale
Stadium Case” located at the end of Chapter 6, and incorporating the following
constraints.
Note: When you create your MS Project
schedule, you will need to update your project per the following constraints:
The project must consist of at least twenty
(20) tasks.
Each task must have a start and finish date
that matches the duration noted in the assignment.
Each task must be assigned to a resource
(e.g., Demolishing Crew; Construction Crew; Landscaping Crew).
Assume that the crew works during normal
weekdays (no weekend work) under normal conditions (8 hours per day).
In terms of holidays, you can assume no work
will be done the following days: New Year’s Day, President’s Day, Good Friday,
Good Monday, Friday before Memorial Day, Memorial Day, the business day before
Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the
day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after
Thanksgiving), the business day before Christmas, Christmas Day, the business
day after Christmas Day, and New Year’s Eve.
Part B: Written Response
(Submit as a Microsoft Word file)
Respond to the following questions in a one to
two (1-2) page paper based on your project schedule.
When will the project be completed?
What is the critical path for the project?
How much slack / float is in your project?
What activities have the greatest slack / float?
Identify the top three (3) activities that you
believe could impact the project completion date.
What additional activities you would add to
this project to make it more complete, from a project management viewpoint?
Typed, double spaced, using Times New Roman
font (size 12), with one-inch margins on all sides.
Include a cover page containing the title of
the assignment, the student’s name, the professor’s name, the course title, and
the date. The cover page is not included in the required page length.
Grading for this assignment will be based on
answer quality, logic/organization of the paper, and language and writing
skills, using the following rubric.
|
Points: 90
|
Assignment 3:
Greendale Project ReDux
|
||||
|
Criteria
|
Unacceptable
Below 60% F
|
Meets Minimum
Expectations
60-69% D
|
Fair
70-79% C
|
Proficient
80-89% B
|
Exemplary
90-100% A
|
|
Part A: Project
Schedule
|
|||||
|
1a. Create a
multi-level work breakdown structure (WBS) and detailed project schedule,
using the information from the “Greendale Stadium Case” located at the end of
Chapter 6, and incorporating the stated constraints.
Weight: 55%
|
Did not submit or
incompletely created a multi-level work breakdown structure (WBS) and
detailed project schedule, using the information from the “Greendale Stadium
Case” located at the end of Chapter 6, and incorporating the stated
constraints.
|
Insufficiently
created a multi-level work breakdown structure (WBS) and detailed project
schedule, using the information from the “Greendale Stadium Case” located at
the end of Chapter 6, and incorporating the stated constraints.
|
Partially created a
multi-level work breakdown structure (WBS) and detailed project schedule,
using the information from the “Greendale Stadium Case” located at the end of
Chapter 6, and incorporating the stated constraints.
|
Satisfactorily created
a multi-level work breakdown structure (WBS) and detailed project schedule,
using the information from the “Greendale Stadium Case” located at the end of
Chapter 6, and incorporating the stated constraints.
|
Thoroughly created a
multi-level work breakdown structure (WBS) and detailed project schedule,
using the information from the “Greendale Stadium Case” located at the end of
Chapter 6, and incorporating the stated constraints.
|
|
Part B: Written
Response
|
|||||
|
1b. Respond to the
stated questions in a one to two (1-2) page paper based on your project
schedule.
Weight: 40%
|
Did not submit or
incompletely responded to the stated questions in a one to two (1-2) page
paper based on your project schedule.
|
Insufficiently
responded to the stated questions in a one to two (1-2) page paper based on
your project schedule.
|
Partially responded
to the stated questions in a one to two (1-2) page paper based on your
project schedule.
|
Satisfactorily
responded to the stated questions in a one to two (1-2) page paper based on your
project schedule.
|
Thoroughly responded
to the stated questions in a one to two (1-2) page paper based on your
project schedule.
|
|
2b. Clarity, writing
mechanics, and formatting.
Weight: 5%
|